Afghan Cultural Heritage Consulting Organization (ACHCO)

LATEST NEWS

...
STUPA-E-TOPDARA

Finished stone masonry on the east elevation of the stupa platform, showing original sections within the niche (Sept 2019)

Location : Parwan


...
STUPA-E-TOPDARA

General view of the stupa from the south west in August 2019

Location : Parwan


...
STUPA-E-TOPDARA

Work continues on stabilising masonry on the west stair, following its excavation (Sept 2019)

Location : Parwan


...
STUPA-E-TOPDARA

Work is proceeding on reconstruction of the east stair leading to the stupa platform, taking dimensions from several steps expos...

Location : Parwan


...
STUPA-E-TOPDARA

Ongoing excavation along the north side, showing conserved platform masonry on the right (Sept 2019)

Location : Parwan


...
Inauguration of conservation work in Herat.

On 1.11.2019 an inauguration ceremony was held in Herat for the conservation of the mausoleum of Wahiz-e Kashifi in the presence...

Location : Herat